顾客调查和网络策略(冰箱行业)(ppt)
综合能力考核表详细内容
顾客调查和网络策略(冰箱行业)(ppt)
Customer Survey and Network Strategy (refrigerator industry )
Major Brands Market Share in 1999
XX China has identified supply chain improvements as one of its corporate priorities to improve customer satisfaction and cost performance.
The overall objective of XX Network Strategy Project is to determine the least cost distribution network configuration to satisfy the specific service level requirements of its current and future target customers
The sample for the customer survey targeted a representation of XX's current operations in China, and its current and future market
The project team focused on obtaining as much customer data through direct interviews. A customer survey was faxed out to broaden geographic coverage
In total, 81 customer survey questionnaires were collected representing a broad cross section of XX customers
… and also XX’s markets
8. Are you being served by XX directly?
Yes No
All responses were in the “Yes” category
9. Sales revenue growth in the next 1-2 years
<15% 16-30% 31-40% 41-60% >60%
Response: 33% 30% 19% 3% 12%
10. What are the key brands of refrigerator in your current business and what is the proportion of these brand sales represent in your total refrigerator sales? Who sell directly? Who supplies you directly ?
11. Please specify the amount of the refrigerator sales in 1999
12. Do you experience the sales fluctuation in different months?
Yes, the fluctuation is as follows No
Peak months are ______________________, Sales _______________units/month
Normal months are ____________________, Sales _______________units/month
Low months are _______________________, Sales _______________units/month
“Ability to Respond to Urgent Orders”, and “Product Availability” ranked the most important factors from the survey
Though above average, the customer satisfaction rate towards XX's ability to respond to urgent orders scored relatively the lowest among all the factors. Customers from most of the regions, such as Carrefour Beijing, Guangzhou Department Store complained that there is no differentiation in response levels between the normal orders and urgent orders
The overall customer satisfactory rate towards XX's ordering service level is particularly low in the Guangdong region
Most of the retailers showed lack of understanding for minimum order quantity and order frequency as they are presently ordering based on demand and payment credit, and regard minimum order quantity as less important in affecting their business revenues. Several customers indicated “1” as desired minimum order size
13. What is you current order transmission mode
Fax Telephone Email Other__________
XX Stockouts - Frequency
XX Stockouts - Value Loss
“Ability to Respond to Urgent Orders”, and “Product Availability” were identified as the most important factors from the survey, which XX performed relatively weak compare to other items in ordering services
The order fulfillment performance varied significantly across the different regions. Markets in which XX have had a longer history of operation, were in close proximity to the manufacturing base, or were more mature markets, (ie Shanghai) reported better customer satisfaction
The overall customer satisfaction for XX's ordering service level is higher than the customer's general experience within the marketplace, with the exception of GZ region
Stock-outs occurs more often during promotional period and new product launch. Customers in GZ region experienced more stock-outs and higher value loss (>10%) due to the growing demands caused by heavy marketing campaign, low inventory, and lack of transparency for inventory and product availability information
Some key accounts whose inventory level is kept low, such as Carrefour, experienced back orders during weekends while XX has no logistics contacts
The order processing workflow is still very manual and paper-based with quite low efficiency. And customers tends to prefer “interactive” ordering modes to get better idea of product availability.
Delivery
Delivery Service Importance and Customer Satisfaction
Delivery Service (continued)
Delivery Service Importance and Customer Satisfaction
Order Fulfillment
In most regions, customers are more satisfied with XX's order fulfillment than the other brands in general. But in both NC and GZ, the satisfaction level is below the overall level.
Customers' desired order fulfill rate is 96% on average, which is higher than XX's current 88% order fulfill rate.
Delivery Lead Time
Customers’ desired lead time is 2 - 4 days.
The survey indicated that XX has no standard order lead time. It varies from the same day to 15 days. In the extreme case of Guangzhou Department Store, the interviewee said the lead time ranges from 3 -15 days.
For urgent orders, the satisfaction with XX is below the other brands in GZ, NC and NE regions. The customer desired lead time is 1.5 days in average. Currently, the XX's lead time ranges from the same day to 15 days. The case of the 15 days lead time occurred to a particular customer, Guangzhou Department Store, which also commented that there was no difference between urgent and standard order lead time.
Delivery Service Importance and Customer Satisfaction
Delivery Punctuality and Accuracy
From the survey result, XX's delivery punctuality is 89% and the accuracy on quantity is 93%. In the GZ, NC and NE regions, the satisfaction with XX delivery punctuality is below the general level. In GZ and NE regions, the customers are less satisfied with XX delivery accuracy than the general level.
Packaging Quality
In Central, GZ and NC regions, the customers are less satisfied with XX packaging quality compared with the general service level. The customers mentioned the following brands for their good packaging quality: National, Siemens, Haier, Shangling and Meiling.
Other Delivery Services
As to the delivery frequency, XX delivers goods to customers based on their orders currently.
Because most of the customers have only one site for delivery, so the need for shipping flexibility like multiple drop-off points are not that important currently.
Tolerated Lead Time
Customer Pickup
Lead Time
Lead Time - Sales Growth Impact
Average XX Inventory
From the survey, customers are generally satisfied with XX's logistics performance, although “lead time towards urgent orders” scored a relatively low level of satisfaction
“Order fulfillment”, “Delivery Accuracy and Punctuality” ranked the most important among the issues related to delivery performance, and XX performance basically satisfies the customers with the exception of GZ region
Almost all the retailers prefer delivery service from XX to be more economic and avoid the difficulties related to internal co-ordinations and goods damages. Though delivery capability is not the key factor compare to the brand image and marketing strength, it is difficult to remove the delivery service from current customers but could be an alternative for new accounts. Another influencing factor is that other key competitors, such as Haier and Siemens are providing delivery service to key accounts
Under the current business environment, most customers do not think shortening lead times can greatly influence sales increase given that the lower importance rating towards lead time and relatively longer lead time tolerance reported in the customer survey. The reduction of price is viewed as the faster and more straight forward way to increase sales
Supporting Services
Supporting Services Importance & Customer Satisfaction
Consignment Sales Alternative
Consignment Sales Alternative Acceptance
Consignment Sales Alternative Acceptance
Sales Increase due to Service Improvement
XX Price Level
Order to Delivery Process
Sales people have no efficient communication with local logistics or RDC staff, therefore have no confidence about the inventory level and product availability. From interviews, we discovered that even local logistics people lack updated LDC inventory information (eg in the Guangzhou office).
There is no immediate confirmation letter to either customers or sales people on what products will be delivered until products arrive.
Both sales personnel and customers complained that the order fulfillment process is inefficient, due to the ineffectiveness of sharing inventory and product availability information among the whole company. It was claimed that the order-to-confirmation cycle usually takes 2-3 days.
Preferred Supplier Status
XX’s Return Policy
Goods returning policy is regarded by the customers as the most complex among all the vendors.
The process of returning goods usually takes 2 weeks at the retailers and 4 weeks at the distributors, and involves a lot of handling which inflicts even more damages to the goods.
The damaged goods verification from XX after-sales people normally needs 2-4 weeks to resolve, due to the present policy which requires damaged goods to be accumulated to more than 5 units before resolution; hence impacting greatly on the customers business and their confidence in selling XX products .
Distributors complained that the goods returning policy is not consistent with the marketing campaign which says goods with quality problems can be returned immediately without any conditions, within one year after the purchase.
The goods return policy of Haier is seen to be better and more efficient, as the damaged goods can be replaced with the new ones within 1 to 2 days. Some vendors, such as Xinfei and Shangling, sell the goods which are slightly damaged at a discounted price at the distributor or retailer site.
Improvement Opportunities
After Sales Service
The after-sales repair service is viewed as one of the most important factors which will influence sales growth. XX' s performance in this areas is viewed as weaker than the competition, particularly in Guangzhou, North China and the North Eastern regions. Key problem areas cited included longer response times, shortage of staff and low technical capability
Haier and Siemens are commonly regarded as examples for providing good after-sales repair services for their timely responding and problem solving
Consignment
Consignment is used as a bargaining tool in the business between vendors and retailers, and is provided by other key players, such as Siemens, Meiling, Changling, Rongsheng, Xinfei,Haier under different circumstances. Usually, consignment is used by vendors to entering into the new markets and in the markets which have weak brand image and marketing positioning. Besides, it is also perceived as a strong bargaining power with its influential positioning from retailers.
With the increase of brand positioning and sales volume, cash on delivery can be perceived as an alternative payment term instead
Improvement Matrix - Consolidated
Market Importance vs. Satisfaction
Our approach to calculating inventory is to develop coefficients that help us “shape the curve” that represents the relationship between throughput and inventory
Additionally, the square root law of inventory can be applied to determine the impact on re-sizing the network
In many instances, the impact of various network options on inventory investment can be accurately assessed from historical operating data
The inventory and production analyses, as well as the Model inputs, are derived from a number of raw data sources. The following list details the types of data that are required for refreshing the Models.
1. List of Warehouses and consignment locations stock locations -
2. List of products by locations SKUs -
3. Cost of Goods Sold (COGS) inventory and carrying costs -
4. Month ending inventory by SKU by location average inventory and turns 12 months
5. Distribution Network Map distribution leadtimes -
6. Sales by SKU by month ABC analysis 12 months
7. Sales by SKU by location by month average demand 12 months
8. Fixed Ordering Cost EOQ Model input -
9. Expected customer service level by product fill rates Safety Stock Calculation -
10. Inventory Carrying Cost (ICC) by location inventory carrying costs -
There are six key factors that are used to properly size cycle stock and safety stock. Strategic business decisions will directly effect these factors, thus changing the size of the total inventory investment.
Transit stock is the inventory necessary to bridge the total leadtime between the point of demand (the stocking location) and the point of supply (the producing plant). This stock is necessary to prevent stock-outs during the lagtime between placing and receiving an order .
EOQ Model Inventory Analysis by ABC Fast/Slow moving type for 1999
Implications of findings for the logistics network modeling strategy
Implications of findings for the logistics network modeling strategy …..cont'd
During the year of 1999, XX has 2 RDCs and 24 LDCs in 20 cities to cover most provinces of China. The only transportation mode outbound from RDC is truck, which is cheaper and more reliable than rail, in China.
XX serves its customers either by RDC directly if the order quantity fits full truck load, or via LDC if the order quantity is less than truck load or when customer demands shorter lead time.
In 1999, total logistics cost represents approx.. 4.5% of sales. The biggest cost component was transportation cost, and 66% of refrigerators (177,000 out of 270,000) were shipped to customers directly from RDC.
In order to optimize logistics network, the following key factors would be taken into consideration:
XX's sales strategy to put more emphasis on retailers than on wholesalers and to serve retailers directly instead of via wholesalers
Balance customer service level and cost-to-serve
Minimize total logistics cost (warehouse cost, transportation cost and inventory carrying cost)
Based on the customer requirements from 81 customer surveys, the following key implications have major impacts on logistics network modeling:
Majority of XX customers (69%) can tolerate a lead time between 3 - 10 days
Few customers think that the shortening of the lead time is the key driver for their sales increase
Average retailer's order quantity is about 15 units per order, and wholesaler's order quantity is normally greater than FTL
In the baseline model, only EOQ (Economy Order Quantity) is applied, and logistics network structure remains the same. So the warehouse and inventory carrying cost decrease, while transportation cost is still the same.
In the model of Option A, the following criteria are considered:
Maintain warehouses in key cities, and consolidate smaller warehouses
Reduce double transportation as much as possible
Lead time from any one of those LDCs to the cities within its service area is 1-2 days ( 1000km) except Ulumuqi (2874km from Xian), Xining (1146km from Xian), Nanning (1008km from Changsha) and Fuzhou (1211km from Changsha)
In Option A, transportation cost is increased by RMB 350,000, warehouse cost is decreased by RMB 930,000, and inventory carrying cost is decreased by RMB 2,200,000.
In the model of Option B, the following criteria are considered:
Any city having 2 or more key accounts is considered to have a LDC. Although Dongguan has 2 key accounts, it is very close to Guangzhou (61KM), so no LDC is setup in Dongguan
Mandatory requirements of key account are satisfied in Dalian and Kunming
Key provincial capital cities with high demand are considered to have LDC
In Option B, transportation cost is increased by RMB 520,000, warehouse cost is decreased by RMB 1,240,000 and inventory carrying cost is decreased by 2,680,000.
In the model of Option C, the following criteria are considered:
6 sales regions, each has 1 LDC in the major city
Mandatory requirements of key accounts are satisfied in Dalian and Kunming
Lead time from any one of those LDCs to the cities within its service area is 1-3 days ( 1500km) except Ulumuqi (3114km from Chengdu) and Yinchuan (1900km from Chengdu)
In Option C, transportation cost is increased by RMB 760,000, warehouse cost is decreased by RMB 1,470,000 and inventory carrying cost is decreased by 3,070,000.
In Option D, transportation cost is increased by RMB 920,000, warehouse cost is decreased by RMB 1,600,000 and inventory carrying cost is decreased by 3,300,000.
顾客调查和网络策略(冰箱行业)(ppt)
Customer Survey and Network Strategy (refrigerator industry )
Major Brands Market Share in 1999
XX China has identified supply chain improvements as one of its corporate priorities to improve customer satisfaction and cost performance.
The overall objective of XX Network Strategy Project is to determine the least cost distribution network configuration to satisfy the specific service level requirements of its current and future target customers
The sample for the customer survey targeted a representation of XX's current operations in China, and its current and future market
The project team focused on obtaining as much customer data through direct interviews. A customer survey was faxed out to broaden geographic coverage
In total, 81 customer survey questionnaires were collected representing a broad cross section of XX customers
… and also XX’s markets
8. Are you being served by XX directly?
Yes No
All responses were in the “Yes” category
9. Sales revenue growth in the next 1-2 years
<15% 16-30% 31-40% 41-60% >60%
Response: 33% 30% 19% 3% 12%
10. What are the key brands of refrigerator in your current business and what is the proportion of these brand sales represent in your total refrigerator sales? Who sell directly? Who supplies you directly ?
11. Please specify the amount of the refrigerator sales in 1999
12. Do you experience the sales fluctuation in different months?
Yes, the fluctuation is as follows No
Peak months are ______________________, Sales _______________units/month
Normal months are ____________________, Sales _______________units/month
Low months are _______________________, Sales _______________units/month
“Ability to Respond to Urgent Orders”, and “Product Availability” ranked the most important factors from the survey
Though above average, the customer satisfaction rate towards XX's ability to respond to urgent orders scored relatively the lowest among all the factors. Customers from most of the regions, such as Carrefour Beijing, Guangzhou Department Store complained that there is no differentiation in response levels between the normal orders and urgent orders
The overall customer satisfactory rate towards XX's ordering service level is particularly low in the Guangdong region
Most of the retailers showed lack of understanding for minimum order quantity and order frequency as they are presently ordering based on demand and payment credit, and regard minimum order quantity as less important in affecting their business revenues. Several customers indicated “1” as desired minimum order size
13. What is you current order transmission mode
Fax Telephone Email Other__________
XX Stockouts - Frequency
XX Stockouts - Value Loss
“Ability to Respond to Urgent Orders”, and “Product Availability” were identified as the most important factors from the survey, which XX performed relatively weak compare to other items in ordering services
The order fulfillment performance varied significantly across the different regions. Markets in which XX have had a longer history of operation, were in close proximity to the manufacturing base, or were more mature markets, (ie Shanghai) reported better customer satisfaction
The overall customer satisfaction for XX's ordering service level is higher than the customer's general experience within the marketplace, with the exception of GZ region
Stock-outs occurs more often during promotional period and new product launch. Customers in GZ region experienced more stock-outs and higher value loss (>10%) due to the growing demands caused by heavy marketing campaign, low inventory, and lack of transparency for inventory and product availability information
Some key accounts whose inventory level is kept low, such as Carrefour, experienced back orders during weekends while XX has no logistics contacts
The order processing workflow is still very manual and paper-based with quite low efficiency. And customers tends to prefer “interactive” ordering modes to get better idea of product availability.
Delivery
Delivery Service Importance and Customer Satisfaction
Delivery Service (continued)
Delivery Service Importance and Customer Satisfaction
Order Fulfillment
In most regions, customers are more satisfied with XX's order fulfillment than the other brands in general. But in both NC and GZ, the satisfaction level is below the overall level.
Customers' desired order fulfill rate is 96% on average, which is higher than XX's current 88% order fulfill rate.
Delivery Lead Time
Customers’ desired lead time is 2 - 4 days.
The survey indicated that XX has no standard order lead time. It varies from the same day to 15 days. In the extreme case of Guangzhou Department Store, the interviewee said the lead time ranges from 3 -15 days.
For urgent orders, the satisfaction with XX is below the other brands in GZ, NC and NE regions. The customer desired lead time is 1.5 days in average. Currently, the XX's lead time ranges from the same day to 15 days. The case of the 15 days lead time occurred to a particular customer, Guangzhou Department Store, which also commented that there was no difference between urgent and standard order lead time.
Delivery Service Importance and Customer Satisfaction
Delivery Punctuality and Accuracy
From the survey result, XX's delivery punctuality is 89% and the accuracy on quantity is 93%. In the GZ, NC and NE regions, the satisfaction with XX delivery punctuality is below the general level. In GZ and NE regions, the customers are less satisfied with XX delivery accuracy than the general level.
Packaging Quality
In Central, GZ and NC regions, the customers are less satisfied with XX packaging quality compared with the general service level. The customers mentioned the following brands for their good packaging quality: National, Siemens, Haier, Shangling and Meiling.
Other Delivery Services
As to the delivery frequency, XX delivers goods to customers based on their orders currently.
Because most of the customers have only one site for delivery, so the need for shipping flexibility like multiple drop-off points are not that important currently.
Tolerated Lead Time
Customer Pickup
Lead Time
Lead Time - Sales Growth Impact
Average XX Inventory
From the survey, customers are generally satisfied with XX's logistics performance, although “lead time towards urgent orders” scored a relatively low level of satisfaction
“Order fulfillment”, “Delivery Accuracy and Punctuality” ranked the most important among the issues related to delivery performance, and XX performance basically satisfies the customers with the exception of GZ region
Almost all the retailers prefer delivery service from XX to be more economic and avoid the difficulties related to internal co-ordinations and goods damages. Though delivery capability is not the key factor compare to the brand image and marketing strength, it is difficult to remove the delivery service from current customers but could be an alternative for new accounts. Another influencing factor is that other key competitors, such as Haier and Siemens are providing delivery service to key accounts
Under the current business environment, most customers do not think shortening lead times can greatly influence sales increase given that the lower importance rating towards lead time and relatively longer lead time tolerance reported in the customer survey. The reduction of price is viewed as the faster and more straight forward way to increase sales
Supporting Services
Supporting Services Importance & Customer Satisfaction
Consignment Sales Alternative
Consignment Sales Alternative Acceptance
Consignment Sales Alternative Acceptance
Sales Increase due to Service Improvement
XX Price Level
Order to Delivery Process
Sales people have no efficient communication with local logistics or RDC staff, therefore have no confidence about the inventory level and product availability. From interviews, we discovered that even local logistics people lack updated LDC inventory information (eg in the Guangzhou office).
There is no immediate confirmation letter to either customers or sales people on what products will be delivered until products arrive.
Both sales personnel and customers complained that the order fulfillment process is inefficient, due to the ineffectiveness of sharing inventory and product availability information among the whole company. It was claimed that the order-to-confirmation cycle usually takes 2-3 days.
Preferred Supplier Status
XX’s Return Policy
Goods returning policy is regarded by the customers as the most complex among all the vendors.
The process of returning goods usually takes 2 weeks at the retailers and 4 weeks at the distributors, and involves a lot of handling which inflicts even more damages to the goods.
The damaged goods verification from XX after-sales people normally needs 2-4 weeks to resolve, due to the present policy which requires damaged goods to be accumulated to more than 5 units before resolution; hence impacting greatly on the customers business and their confidence in selling XX products .
Distributors complained that the goods returning policy is not consistent with the marketing campaign which says goods with quality problems can be returned immediately without any conditions, within one year after the purchase.
The goods return policy of Haier is seen to be better and more efficient, as the damaged goods can be replaced with the new ones within 1 to 2 days. Some vendors, such as Xinfei and Shangling, sell the goods which are slightly damaged at a discounted price at the distributor or retailer site.
Improvement Opportunities
After Sales Service
The after-sales repair service is viewed as one of the most important factors which will influence sales growth. XX' s performance in this areas is viewed as weaker than the competition, particularly in Guangzhou, North China and the North Eastern regions. Key problem areas cited included longer response times, shortage of staff and low technical capability
Haier and Siemens are commonly regarded as examples for providing good after-sales repair services for their timely responding and problem solving
Consignment
Consignment is used as a bargaining tool in the business between vendors and retailers, and is provided by other key players, such as Siemens, Meiling, Changling, Rongsheng, Xinfei,Haier under different circumstances. Usually, consignment is used by vendors to entering into the new markets and in the markets which have weak brand image and marketing positioning. Besides, it is also perceived as a strong bargaining power with its influential positioning from retailers.
With the increase of brand positioning and sales volume, cash on delivery can be perceived as an alternative payment term instead
Improvement Matrix - Consolidated
Market Importance vs. Satisfaction
Our approach to calculating inventory is to develop coefficients that help us “shape the curve” that represents the relationship between throughput and inventory
Additionally, the square root law of inventory can be applied to determine the impact on re-sizing the network
In many instances, the impact of various network options on inventory investment can be accurately assessed from historical operating data
The inventory and production analyses, as well as the Model inputs, are derived from a number of raw data sources. The following list details the types of data that are required for refreshing the Models.
1. List of Warehouses and consignment locations stock locations -
2. List of products by locations SKUs -
3. Cost of Goods Sold (COGS) inventory and carrying costs -
4. Month ending inventory by SKU by location average inventory and turns 12 months
5. Distribution Network Map distribution leadtimes -
6. Sales by SKU by month ABC analysis 12 months
7. Sales by SKU by location by month average demand 12 months
8. Fixed Ordering Cost EOQ Model input -
9. Expected customer service level by product fill rates Safety Stock Calculation -
10. Inventory Carrying Cost (ICC) by location inventory carrying costs -
There are six key factors that are used to properly size cycle stock and safety stock. Strategic business decisions will directly effect these factors, thus changing the size of the total inventory investment.
Transit stock is the inventory necessary to bridge the total leadtime between the point of demand (the stocking location) and the point of supply (the producing plant). This stock is necessary to prevent stock-outs during the lagtime between placing and receiving an order .
EOQ Model Inventory Analysis by ABC Fast/Slow moving type for 1999
Implications of findings for the logistics network modeling strategy
Implications of findings for the logistics network modeling strategy …..cont'd
During the year of 1999, XX has 2 RDCs and 24 LDCs in 20 cities to cover most provinces of China. The only transportation mode outbound from RDC is truck, which is cheaper and more reliable than rail, in China.
XX serves its customers either by RDC directly if the order quantity fits full truck load, or via LDC if the order quantity is less than truck load or when customer demands shorter lead time.
In 1999, total logistics cost represents approx.. 4.5% of sales. The biggest cost component was transportation cost, and 66% of refrigerators (177,000 out of 270,000) were shipped to customers directly from RDC.
In order to optimize logistics network, the following key factors would be taken into consideration:
XX's sales strategy to put more emphasis on retailers than on wholesalers and to serve retailers directly instead of via wholesalers
Balance customer service level and cost-to-serve
Minimize total logistics cost (warehouse cost, transportation cost and inventory carrying cost)
Based on the customer requirements from 81 customer surveys, the following key implications have major impacts on logistics network modeling:
Majority of XX customers (69%) can tolerate a lead time between 3 - 10 days
Few customers think that the shortening of the lead time is the key driver for their sales increase
Average retailer's order quantity is about 15 units per order, and wholesaler's order quantity is normally greater than FTL
In the baseline model, only EOQ (Economy Order Quantity) is applied, and logistics network structure remains the same. So the warehouse and inventory carrying cost decrease, while transportation cost is still the same.
In the model of Option A, the following criteria are considered:
Maintain warehouses in key cities, and consolidate smaller warehouses
Reduce double transportation as much as possible
Lead time from any one of those LDCs to the cities within its service area is 1-2 days ( 1000km) except Ulumuqi (2874km from Xian), Xining (1146km from Xian), Nanning (1008km from Changsha) and Fuzhou (1211km from Changsha)
In Option A, transportation cost is increased by RMB 350,000, warehouse cost is decreased by RMB 930,000, and inventory carrying cost is decreased by RMB 2,200,000.
In the model of Option B, the following criteria are considered:
Any city having 2 or more key accounts is considered to have a LDC. Although Dongguan has 2 key accounts, it is very close to Guangzhou (61KM), so no LDC is setup in Dongguan
Mandatory requirements of key account are satisfied in Dalian and Kunming
Key provincial capital cities with high demand are considered to have LDC
In Option B, transportation cost is increased by RMB 520,000, warehouse cost is decreased by RMB 1,240,000 and inventory carrying cost is decreased by 2,680,000.
In the model of Option C, the following criteria are considered:
6 sales regions, each has 1 LDC in the major city
Mandatory requirements of key accounts are satisfied in Dalian and Kunming
Lead time from any one of those LDCs to the cities within its service area is 1-3 days ( 1500km) except Ulumuqi (3114km from Chengdu) and Yinchuan (1900km from Chengdu)
In Option C, transportation cost is increased by RMB 760,000, warehouse cost is decreased by RMB 1,470,000 and inventory carrying cost is decreased by 3,070,000.
In Option D, transportation cost is increased by RMB 920,000, warehouse cost is decreased by RMB 1,600,000 and inventory carrying cost is decreased by 3,300,000.
顾客调查和网络策略(冰箱行业)(ppt)
[下载声明]
1.本站的所有资料均为资料作者提供和网友推荐收集整理而来,仅供学习和研究交流使用。如有侵犯到您版权的,请来电指出,本站将立即改正。电话:010-82593357。
2、访问管理资源网的用户必须明白,本站对提供下载的学习资料等不拥有任何权利,版权归该下载资源的合法拥有者所有。
3、本站保证站内提供的所有可下载资源都是按“原样”提供,本站未做过任何改动;但本网站不保证本站提供的下载资源的准确性、安全性和完整性;同时本网站也不承担用户因使用这些下载资源对自己和他人造成任何形式的损失或伤害。
4、未经本网站的明确许可,任何人不得大量链接本站下载资源;不得复制或仿造本网站。本网站对其自行开发的或和他人共同开发的所有内容、技术手段和服务拥有全部知识产权,任何人不得侵害或破坏,也不得擅自使用。
我要上传资料,请点我!
管理工具分类
ISO认证课程讲义管理表格合同大全法规条例营销资料方案报告说明标准管理战略商业计划书市场分析战略经营策划方案培训讲义企业上市采购物流电子商务质量管理企业名录生产管理金融知识电子书客户管理企业文化报告论文项目管理财务资料固定资产人力资源管理制度工作分析绩效考核资料面试招聘人才测评岗位管理职业规划KPI绩效指标劳资关系薪酬激励人力资源案例人事表格考勤管理人事制度薪资表格薪资制度招聘面试表格岗位分析员工管理薪酬管理绩效管理入职指引薪酬设计绩效管理绩效管理培训绩效管理方案平衡计分卡绩效评估绩效考核表格人力资源规划安全管理制度经营管理制度组织机构管理办公总务管理财务管理制度质量管理制度会计管理制度代理连锁制度销售管理制度仓库管理制度CI管理制度广告策划制度工程管理制度采购管理制度生产管理制度进出口制度考勤管理制度人事管理制度员工福利制度咨询诊断制度信息管理制度员工培训制度办公室制度人力资源管理企业培训绩效考核其它
精品推荐
下载排行
- 1社会保障基础知识(ppt) 16695
- 2安全生产事故案例分析(ppt 16695
- 3行政专员岗位职责 16695
- 4品管部岗位职责与任职要求 16695
- 5员工守则 16695
- 6软件验收报告 16695
- 7问卷调查表(范例) 16695
- 8工资发放明细表 16695
- 9文件签收单 16695
- 10跟我学礼仪 16695